Transportation & Logistics· 9 monthsIllustrative case

Recovering margin in a cross-border truckload network

Asset-based truckload carrier · 1,200 tractors · US–Mexico

$5.8M of run-rate EBITDA realised in nine months — 84% of the value identified in the Flash Scan, without new technology spend in the first phase.

EBITDA margin
7.1%8.9%▲ improvement
Deadhead
21.4%15.8%▼ improvement
Accessorial capture
69%93%▲ improvement
On-time delivery
93.8%95.6%▲ improvement
Illustrative case: a composite scenario built from the type of work we do. It does not describe a specific client, and its figures are examples.

The situation

Volume had grown 14% in two years while EBITDA margin fell from 9.2% to 7.1%. Leadership had three competing explanations — fuel, driver costs and pricing — and a TMS upgrade proposal on the table.

The CFO wanted to know where margin was really being lost before approving any capital.

Trigger:EBITDA and value under pressure

How it unfolded — gate by gate

  1. 1

    Flash Scan

    1 dayGo

    Eight weeks of load, lane and billing data. Four corridors and the billing process flagged as the main leaks.

  2. 2

    Value Scan™ + Value Assessment™

    4 weeksGo

    Lane- and customer-level cost-to-serve; benchmarks for deadhead, utilisation and accessorial capture.

  3. 3

    Value Blueprint™

    3 weeksGo

    Five initiatives with owners, business cases and a 100-day value track. TMS upgrade deferred until the operating model was defined.

  4. 4

    Proof of Value™

    6 weeksScale

    Backhaul and pricing change piloted on one corridor against a fixed baseline.

  5. 5

    Value Assurance & Realisation™

    Ongoing

    Monthly realised-margin review in the Decision Office with the CFO and COO.

Results

  • Detention and accessorials billed systematically from event data: +$2.0M a year.
  • Bottom 10% of lanes repriced or exited: +$1.5M.
  • Backhaul rebalanced on four corridors: +$2.3M after the pilot proved the case on one.
  • TMS investment re-scoped to the defined operating model, cutting the original budget by a third.

What made the difference

  • Averages hid the problem: the leak was concentrated in four corridors and one process.
  • Billing fixes funded the larger network moves.
  • Deferring technology until the operating model was clear avoided buying the wrong system.